The amount of dirt fill required to reach finish grade under the 5,000 square-feet of track surface had been calculated.  The clean fill was delivered to the site before construction started and can be seen at the left in this photograph.  The contractor erected the outside forms to the specifications of the drawings before moving the fill into place with the Bobcat seen in the background. 