C-Town Raceway

  INDEX 

 

Pouring Concrete

And then came the concrete trucks.  About seventy yards of concrete was needed to complete the track.  The first four trucks brought the stiff slump required for the banked curves, hill and moguls. 

(09.24.02)

 

Copyright 2002 David Stall