|
C-Town Raceway |
|
|
Pouring Concrete From original concept drawing to finished plans there were no changes made to the track design. Curves, widths, banks, grades, lengths all stayed the same. Construction drawings introduced a slight overall slope to achieve proper drainage across the entire track. No on-the-fly changes were made during construction. (09.24.02) Copyright 2002 David Stall |
|